CSUsayswindfarmcouldberunni.cfm
|
|
CSU says wind farm could be running in 2010FORT COLLINS, Colo. (AP)--Colorado State University says a wind farm capable of powering its entire campus could be up and running in 2010. CSU said Sept. 24 it's ready to apply for permits to build the wind farm on a Larimer County ranch owned by the university near the Wyoming border. The university first announced plans for the wind farm in March 2007. The operation would have at least 25 turbines. The electricity would not be fed directly to the campus but rather would flow into the broader power grid that the campus and other users draw from. Bill Farland, CSU's vice president for research, says he's optimistic the wind farm can get approval, be constructed and be producing power within two years. 10/6/08 Date: 10/1/08
Copyright/Privacy
Copyright 1995-2011. High Plains Publishers, Inc. All rights reserved. Any republishing of these pages, including electronic reproduction of the editorial archives or classified advertising, is strictly prohibited. If you have questions or comments you can reach us at High Plains Journal 1500 E. Wyatt Earp Blvd., P.O. Box 760, Dodge City, KS 67801 or call 1-800-452-7171. Email: webmaster@hpj.com |
|